Tesla’s solar factory in Buffalo fizzles

When Gov. Andrew Cuomo announced plans in 2013 for what is now Tesla’s factory in South Buffalo, he pitched it as a cornerstone of the “clean energy revolution” and a new high-tech industrial sector for Western New York.

The project would create not only more than 1,400 direct jobs, but spin-off development that would provide a supply chain employing thousands of additional workers. Cuomo proclaimed the project a “game-changer.”

Fast-forward to today. Less than one-quarter of the workforce at the Tesla factory is engaged in solar-related manufacturing. That work was suspended altogether for at least six months last year. 

Employees told Investigative Post that the current solar work takes up less than 20 percent of the plant’s sprawling 1.2 million square feet, built and equipped with $959 million in state tax dollars.

A current Tesla employee told Investigative Post that four years agoevery person there was solar … 300 to 400 people are probably working solar now. 

“It’s a shadow of what it once was.”



Most of the jobs at the Tesla factory these days involve work related to Tesla’s electric vehicles. Many are entry-level desk jobs that require only a high school diploma.

About 500 jobs — nearly one-third of the current workforce of 1,636 — are those entry-level desk positions, in which workers label images from the company’s self-driving vehicle software — merge signs, turning lanes, pedestrians — in an attempt to train the autonomous driving algorithms. The rest of the auto-related jobs involve the assembly of charging equipment for Tesla cars.

“I don’t believe that the solar manufacturing that was promised in New York is being executed as planned or as promised,” said Christoper Stout, a Tesla employee who’s worked at the plant since early 2019 and is currently on leave. 

The Tesla plant has not generated any of the anticipated spin-off development. Vast expanses of  land around the Tesla plant remains fallow, save for a Tim Horton’s across from the plant’s main entrance. 

Behind the Tesla factory, a state development agency owns more than 100 acres of vacant land. Another 50 acres across the street, controlled by assorted private owners, is largely empty. And developer Peter Krog lists an additional 35 acres as up for development just across the Buffalo River.

The state has amended its contract with Tesla no fewer than a dozen times over the years, reducing the number of required manufacturing jobs and loosening the definition of what constitutes that work. A former Empire State Development official confirmed to Investigative Post that the state allowed and encouraged Tesla to use the facility for purposes beyond solar manufacturing.

This story is based on a review of hundreds of pages of court records, 3,000 pages of emails and other documents; interviews with three employees — two current, one former — as well as three solar industry analysts and a former executive with Empire State Development, the development agency that oversees the Tesla project. Tesla and current ESD officials, as well as executives with Panasonic, Tesla’s short-lived partner, refused interview requests. 

“I’d say that Buffalo probably could have invested a billion dollars more effectively,” said John Engle, an investor and analyst who has studied Tesla.

Buffalo struggles to produce Solar Roof

In Cuomo’s original conception of the South Buffalo factory, two companies — Silevo and Soraa — would share the space and kickstart a new clean energy sector. Silevo was to manufacture high-efficiency solar cells and Soraa was to produce LED lights. The plan was supposed to net Buffalo 850 jobs for a $225 million state investment.

But plans changed. And the state’s investment skyrocketed.

Between 2014 and 2015, Soraa pulled out of Buffalo, and SolarCity, the solar panel sales and installation company, bought Silevo. Cuomo, at the time, celebrated the pivot as a “landmark investment and economic game-changer.” 

The state’s investment, meanwhile, shot up to $750 million in exchange for more jobs, a total of at least 1,460. In theory, SolarCity’s acquisition made sense: Silevo would manufacture solar panels that SolarCity would then sell and install.

That’s not what happened. 


Follow us on Facebook, Twitter, Instagram & YouTube


SolarCity had never been profitable. In 2015 alone, it lost $710 million

The losses prompted Elon Musk, its chairman, to push for Tesla, which he also headed, to purchase SolarCity, which was managed by his cousins,  Lyndon and Peter Rive. At the time of the merger, SolarCity was $3.4 billion in debt.

That purchase went through in late 2016, despite misgivings by some Tesla board members, court records show. To win them over, Musk unveiled plans for a revolutionary product, a roof composed entirely of solar panels. The sleek, black-tiled Solar Roof would be built at the Buffalo factory instead of more traditional solar panels.

“Latest feedback from major investors is very negative on SolarCity,” Musk wrote to Peter Rive in September 2016, prior to the acquisition, according to emails released as part of the lawsuit aggrieved shareholders filed against Musk in 2017. “We need to show them what the integrated product looks like. They just don’t get it. Needs to happen before the vote.”

A month later, Musk debuted the Solar Roof, saying its tiles would “look better than a normal roof, generate electricity, last longer, have better insulation and have an installed cost that is less than a normal roof plus the cost of electricity. Why would you buy anything else?”

The trouble was, the Solar Roof was in the concept stage and not close to being ready for manufacturing. Musk, in a deposition he gave during the lawsuit against him, conceded the Solar Roof was a “nascent product.”

Lawsuit documents also show that Tesla explored abandoning Buffalo altogether as it contemplated buying SolarCity. Evercore, a financial advisory firm, prepared a due-diligence report for Tesla that explored, in part, paying up to $290 million in penalties to New York in exchange for pulling SolarCity out of Western New York. 

But, in addition to the cost of the penalty, the report concluded that reneging on the deal would have too many political costs, as Tesla was attempting to expand its electric car business in the state.

“Any action by SolarCity related to this project that is viewed negatively by the local policymakers could negatively impact policies for the combined entity,” the report concluded.

Page 1 of Evercore analysis for Tesla

Contributed to DocumentCloud by J. Dale Shoemaker (Investigative Post) • View document or read text

So, Tesla settled on using the Buffalo factory to produce its new Solar Roof product. After further research and development, Tesla began production in August 2017. It was done in partnership with Panasonic, which produced the solar cells used in the Solar Roof, in addition to standard solar panels.

The effort faltered.

Production lagged and in February 2019, Tesla laid off 50 of its 400 employees. (Panasonic employed another 400.) Emails from that time show Empire State Development spokeswoman Pamm Lent coaching Tesla to do “proactive press” to show the plant was “still essentially in r and d mode which will have down time associated with it.”

Stout, the current Tesla employee whose job involved building and maintaining manufacturing lines, said the plant struggled to produce the Solar Roof. 

“It was a bad design all around,” he said of the initial version of the Solar Roof. “It was a poor product design, and then the manufacturing design was not sufficient to bring it to scale.”

The Solar Roof was beset by additional problems: Panasonic’s solar panels didn’t mesh with the Solar Roof design, and Tesla officials didn’t like the color.

“I think the appearance was a big sticking point,” Ethan Richenberg, a former Panasonic employee, told Investigative Post. “They wanted these roof tiles to look uniformly black, like you have a black roof on your house. And I think the Panasonic cells, if you look at them, they’re kind of a semi-iridescent, blue-ish, green-ish color.” 

Tesla’s unwillingness to buy solar components from Panasonic contributed to the company pulling out of the Buffalo plant in 2020. That March, Panasonic informed the U.S. Department of Labor it was leaving because “the demand for Panasonic’s solar cells has decreased due to Tesla and other companies importing solar cells from China.”

Panasonic’s 400 jobs were shipped off to Malaysia. In the process, the United States lost one of its only manufacturers of solar cells.

Tesla buying from Panasonic “would have made it more worthwhile for them to stay,” said Richenberg.

Stout confirmed that Tesla struggled to use Panasonic’s solar cells.

“Eventually Tesla just stopped using the solar cells that were being made in their own building because they couldn’t figure it out,” he said.

Subscribe to our free weekly newsletter


Instead, Tesla opted to buy imported solar cells from China and began production of its third version of its Solar Roof in October 2019. 

The goal was to produce 1,000 Solar Roofs per week, Stout said. Initial production was half or less, he said. By early 2020, production and staffing had picked up, only to have COVID-19 force a shutdown of the entire plant from March to May 2020.

Production of the Solar Roof  resumed until December 2021, Stout said, before Tesla shut it down completely. The reason: The U.S. government, as reported by Reuters and The Washington Post, had banned the importation of solar components from China amid concerns they were produced with the help of slave labor.

In its February 2022 report, Tesla reported to New York that those import restrictions “necessitated the temporary shutdown of solar roof production at Gigafactory New York.”

A current Tesla employee said the company was able to resume imports and restart Solar Roof production by August, but at a limited capacity.

“It’s happening, but it’s not happening at scale,” the employee said.

Desk work replaces solar jobs

The shift in Buffalo to work related to electric cars reflects a trend in Tesla’s solar business.

In June 2018, CNBC reported that the company was “sharply downsizing” its residential solar business. Layoffs came to Buffalo in early 2019. 

Then, in June of this year, Electrek, a publication that follows the electric vehicle industry, reported that Tesla was halting future Solar Roof installations. The publication reported in November that Tesla was scaling back its solar business across the board.

The Solar Roof remains expensive compared to traditional solar panels. The Solar Roof today sells for over $55,000, more than triple the cost of traditional panels.

Tesla’s lagging solar business caused it to bring to Buffalo hundreds of employees working on its self-driving vehicle software. That software has been implicated in 10 fatal vehicle crashes.


Donate to support our nonprofit newsroom


Aaron Greenspan, a longtime Silicon Valley figure and founder of the transparency website Plainsite, said the company’s failure to produce the Solar Roof  has left customers angry and the public in the dark.

“What really stuns me is that the company has been able to get away with, I think, if not outright lying to the state of New York, then certainly misleading the state of New York as to what it intended to do,” Greenspan said.

Engle, the investor and analyst who has studied Tesla, said, “Buffalo definitely got sold a bill of goods.”

He added: “Eventually there will be a reckoning. But it may take a while.”

The post Tesla’s solar factory in Buffalo fizzles appeared first on Investigative Post.

Related articles

‘Sick, twisted and tragic’: MSNBC’s Nicolle Wallace unleashes on Kash Patel



MSNBC host Nicolle Wallace unleashed on FBI Director Kash Patel for what she called a "sick, twisted and cruel" way of destroying the FBI.

On Tuesday, Wallace welcomed New York Times reporter Glenn Thrush, who exposed the FBI for going after an agent who was blamed for being part of an investigation he had nothing to do with. Another was shoved out at a time his wife was facing cancer and having an adverse reaction to chemotherapy.

Last week, three fired FBI agents filed a lawsuit against the FBI and Kash Patel. On Tuesday, two more are seeking solutions to fight back against their firing.

Chris Meyer and Walter Giardina, both decorated combat veterans with years of service in the FBI, are now also suing after their firing, too. These agents were likely the two that the previous three supervisors mentioned fighting for in the previous lawsuit, Thrush said.

"Last month, Mr. Patel summarily fired Mr. Meyer and another top agent in the Washington, D.C., field office who had been targeted by the right, Walter Giardina," the report said. "Mr. Patel did so after being told that the terminations were unlawful and that pushing out Mr. Giardina, who was caring for his dying wife, would be 'inexcusably cruel,' according to a lawsuit filed by three F.B.I. supervisors also dismissed by Mr. Patel."

"There's a special provision in the law that allows FBI agents who are veterans to have due process, whereas if they had not been veterans, they could be fired without cause," said Thrush.

They requested due process as part of an official investigation before they were fired, but they were denied it.

"You know, these were not folks who were aspiring in the political arena or wanted to make a lot of money or wanted to even trade in these jobs for more lucrative private sector gigs. They wanted to spend their entire career in the bureau," Thrush said.

Thrush noted that Walter Giardina was a midshipman who graduated from the Naval Academy.

"One of the phenomena of Trump's two terms, and he's done it a lot more quickly in a second term because of the purge that he ordered, is to run out of the FBI, the very human beings that could most likely make him a successful president," said Wallace.

She pointed out the exchange between Patel and Sen. Cory Booker (D-NJ) in which the senator asks about key people being taken off of jobs involving terrorism and trafficking to deal with deportations. Patel claimed he cared about those issues, but those experts working on the cases are the ones being shoved out.

"And there's something so cynically tragic about depriving the FBI — like the people in charge of stopping and catching the people that trafficked children and women and international drug cartels. I mean, to take the people who would wear capes if it didn't give them away and run them out of the agency for which he could get the most credit for doing a good job and the things he says he cares about is so sick and twisted and tragic," said Wallace.


‘We have an intolerable threat’: Trump’s new ‘stunt’ blasted as ‘cruel intimidation’



Leaders at the ACLU on Tuesday joined other rights advocates and elected Democrats in condemning US President Donald Trump’s decision to deploy the National Guard to Memphis with a Monday order he signed beside Republican Tennessee Gov. Bill Lee.

“When military troops police civilians, we have an intolerable threat to individual liberty and the foundational values of this country,” said Hina Shamsi, director of the ACLU’s National Security Project, in a statement.

“President Trump may want to normalize armed forces in our cities, but no matter what uniform they wear, federal agents and military troops are bound by the Constitution and have to respect our rights to peaceful assembly, freedom of speech, and due process,” Shamsi continued. “State and local leaders must stay strong and take all lawful measures to protect residents against this cruel intimidation tactic.”

While Lee expressed his gratitude to Trump for the order, some other elected officials in Tennessee have spoken out since Trump previewed his plans for Memphis on “Fox & Friends” last Friday.

The Associated Press reported on local opposition Monday:

“I did not ask for the National Guard, and I don’t think it’s the way to drive down crime,” Memphis Mayor Paul Young told a news conference Friday while acknowledging the city remained high on too many “bad lists.”

Young has also said that now the decision is made, he wants to ensure he can help influence the Guard’s role. He mentioned possibilities such as traffic control for big events, monitoring cameras for police and undertaking beautification projects.

At a news conference Monday, some local Democrats urged officials to consider options to oppose the deployment. Tami Sawyer, Shelby County General Sessions Court Clerk, said the city or county could sue.

State Rep. Justin Pearson (D-86), whose district includes parts of the city, declared, “We need poverty eradication, not military occupation!”

Denouncing Trump’s targeting of Memphis on MSNBC, Rep. Steve Cohen (D-Tenn.) said that “having the National Guard here is unnecessary and it is a stunt. It’s just a Trump show, to show his power and his force.”

“I think this may be the first representation of his changing the Department of Defense to the Department of War, because he likes to put the National Guard at his direction, as his being the great warrior, into cities and going to war,” he added.

According to a White House fact sheet, Trump’s memorandum tasks Secretary of War Pete Hegseth with requesting Lee “make Tennessee National Guard units available to support public safety and law enforcement operations in Memphis,” and further directs Hegseth to “coordinate with state governors to mobilize National Guard personnel from those states to support this effort.”

The order also “establishes a Memphis Safe Task Force tasked with ending street and violent crime in Memphis to the greatest possible extent, including by coordinating closely with state and local officials in Tennessee, Memphis, and neighboring jurisdictions to share information, develop joint priorities, and maximize resources to make Memphis safe and restore public order.”

🪡Governor Bill Lee, Senator Marsha Blackburn, Rep. David Kustoff, and Sen. Brent Taylor have chosen fear-mongering and authoritarianism over real solutions. They voted to gut healthcare and food security from Memphians. Sending troops will not fix the failures they created.
— Indivisible Memphis (@indivisiblememphis.bsky.social) September 14, 2025 at 8:19 PM

Trump has already deployed the National Guard to Washington, DC, and Los Angeles, California, and threatened to do so in Chicago, Illinois, where his deadly “Operation Midway Blitz” targeting immigrants is already underway.

“Expanding military involvement into US civilian law enforcement is dangerous and unwarranted,” Tanya Greene, US program director at Human Rights Watch, said Tuesday. “The Trump administration’s continued deployment of military forces in cities with populations primarily comprised of people of color, like Memphis, risks exacerbating violence against immigrants, unhoused people, and poor people in general.”

“While communities desperately need food, affordable housing, and healthcare,” she added, “hundreds of millions of taxpayer dollars are being squandered on these deployments.”

5 Points on Trump’s High-Stakes Onslaught Against Fed Governor Lisa Cook

An appeals court ruled late Monday that Federal Reserve Governor Lisa Cook could not be fired by President Donald Trump...